1. PRE-RIG: Build your mechanical advantage system and attach it to the rope.
2. SECURE: Use internal Velcro® loops to lock down pulleys and hardware.
3. PACK: Flake the remaining 300' of rope into the main compartment.
4. DEPLOY: At the scene, pull the entire system out fully assembled, anchor it, and execute the mission.